Grading the property in preparation for the cinder block wall was next….they moved so much dirt.  The slope was more severe that expected so when it was level to the building in the back for the patio….it was in a hole about 5 feet deep.  We had to keep pushing the dirt to the back of the property where there is now a berm about 5 feet high and 6 wide.